Describe why analysts begin with the As-Is system, rather than starting with the design of a To-Be system.

Describe why analysts begin with the As-Is system, rather than starting with the design of a To-Be system.

Describe why analysts begin with the As-Is system, rather than starting with the design of a To-Be system.
Describe why analysts begin with the As-Is system, rather than starting with the design of a To-Be system.

 

READ ALSO :   Dual Diagnosis and Comorbidity in Mental HEalth Patients