construction project scheduling DML VS LSM

construction project scheduling DML VS LSM

Project description
Read chapter 11, pp 281-295, and chapter 12, pp 299-311 from Mubarak,S. (2010).textbook construction project scheduling and control (2nd ed.). Hoboken, NJ: John Wiley.
Explain the differences and similarities between Dynamic Minimum lag (DML) and Linear scheduling method (LSM). in addition, give an example of a scenario where you would prefer one over the other and explain your rationale for selecting the same.
font: Arial, size 12, double space
Length:2-3 pages
Citation style: APA

PLACE THIS ORDER OR A SIMILAR ORDER WITH US TODAY AND GET AN AMAZING DISCOUNT 🙂

 

READ ALSO :   Jivaro beliefs