CE2304 Geotechnics – Soil Mechanics Re-sit Coursework (2013/14)

Q1.  A  cofferdam  is  constructed  to  create  a  dry  work  environment  for
construction of a hydraulic structure. The cross section through the cofferdam
with  the  length  of  40m  is  shown  in  the  figure  Q.1  below.  Permeability  of  the
soil in horizontal and vertical directions is 5 10

 
⁄ .

a)  Draw  the  flow  net  for  the  section  of  the  cofferdam  presented  in  the
figure below [20% of mark]

b)  Determine the rate of seepage into the cofferdam [15% of mark]

c)  What  will  be  the  quantity  of  water  seeped  through  into  the  whole
cofferdam in one year’s time? [15% of mark]

Figure Q.1

Q2. A section of an 87m long dam (Figure Q.2.a) and its corresponding flow
net (Figure Q.2.b) are shown below. The hydraulic conductivity value for both
directions for the top soil layer is 3  10

m sec ⁄   and for the bottom soil layer
is 5 10

m sec ⁄ .

Figure Q.2.a

Figure Q.2.b

a)  Calculate the scale transformation factor that is used to create the flow
net (Figure Q.2.b) [20% of mark]

b)  What is the quantity of seepage per second per unit length of the dam?
[15% of mark]

c)  What will be the quantity of water seeping through the whole dam in 5
years? [15% of mark]

NOTE:
–  Answer both questions
–  Please  make  sure  that  you  clearly  label  each  section  in  your  answers  with  the
relevant problem component letter and the question number (i.e. Q1a, Q1b…)
–  All  the  answers  must  be  prepared  using  MS-Office  or  any  other  software  of  your
choice (handwritten documents are not acceptable except the flow net)