Risk Workshop and Risk Register
Project description
This document contains Strayer University Confidential and Proprietary information and may not be copied, further distributed, or otherwise disclosed in whole or in part, without the expressed
written permission of Strayer University. BUS 519 Student Version 1146 (1219 5-29-2014)
Page 11 of 17
Assignment 3: Risk Workshop and Risk Register Due Week 6 and worth 240 points
Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.
Write an eight to ten (8-10) Risk Workshop and Risk Register Component paper in which you: 1. Identify the required pre-workshop activities. 2. Prepare a risk workshop agenda based on Figure
B-8, Sample Agenda for a First Risk Assessment / Two – Day Risk Workshop (Appendix B of the Hillson and Simon text). Include suggested time intervals for each activity and justify why each
agenda item is relevant for this case. 3. Determine the top five (5) threats in a risk register following Figure B-11, Sample Simplified Risk Register Format (Appendix B of the Hillson and Simon
text). Include information from the case for each threat. 4. Justify the assignment of probability and impacts for each threat identified in criterion number 3 of this assignment. 5. Document the
top three (3) opportunities in a risk register following Figure B-11, Sample Simplified Risk Register Format (Appendix B of the Hillson and Simon text). Include information from the case for each
opportunity. 6. Justify the assignment of probability and impacts for each opportunity identified in criterion number 5 of this assignment. 7. Use at least two (2) quality resources in this
assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.
Your assignment must follow these formatting requirements: • Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides. • Include a cover page
containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required
assignment page length.