Engineering and Construction Geotechnics

Engineering and Construction
Geotechnics
Project description
Its a ( report ) included 1 map and 3 tables, ill upload it later.
The accompanying geological map is at a scale of 1:10000 ( map 1 ).Borehole loges a from three points along the

road are also included ( Figures 1,2 and 3 ).
It proposed to construct a new highway whose center line is shown between location A and B.The carriageway will be

at a level of 105m above Ordnance Datum at A and B,there will be no change in elevation along this section of the

road .
Produce a report ,illustrated with appropriate geological section(s) and any other figures you consider useful,that

describes :
a- the geology of the area making reference to the origin of the rocks identified;
b- the possible problems that the geology may pose for the construction of the highway and associated structures

such as embankments,bridges or cutting and
c- classify possible geological sources of materials within the map area which could be used in the construction of

the highway and its associated structures.

READ ALSO :   Academic help online